Arc welding (MIG/MAG, TIG, MMA, FCAW): what goes wrong and where to inspect

Most fabricated products in Turkey are welded with MIG/MAG, TIG, MMA or flux cored processes, manually or by robot. Weld quality is controlled before, during and after welding.

01How the process works

An electric arc melts the base metal and a filler wire or electrode, shielded by gas or flux. Welding procedure specifications (WPS) define processes, consumables, parameters, preheat and sequence; procedures and welders are qualified by test.

Weld quality cannot be fully verified after the event, which is why standards such as ISO 3834 require control of the whole chain: qualified procedures and welders, consumable handling, fit-up, preheat, interpass temperature and NDT.

  1. WPS and qualification. Procedures qualified, welders certified.
  2. Fit-up. Joint preparation, gap and alignment checked.
  3. Welding. Root, fill and cap with controlled parameters.
  4. Post weld. Cleaning, PWHT if required.
  5. Inspection. VT, NDT, dimensional checks.

02What typically goes wrong

DefectTypical causeHow it is found
PorosityGas coverage, contamination, moistureVT, RT
Lack of fusionLow heat input, techniqueUT, RT
CracksHydrogen, restraint, preheatMT, PT, UT
UndercutCurrent, travel speedVT with gauges
Incomplete penetrationJoint prep, root gapRT, UT
DistortionHeat input, sequenceDimensional check

03Where an inspector should look

01

Before production

  • WPS, WPQR and welder certificates
  • Consumable certificates and storage
  • Weld map and NDT plan
02

During production

  • Fit-up and tack welds
  • Preheat and interpass temperature
  • Parameters against WPS
03

After production

  • Visual inspection to ISO 5817 level
  • NDT per plan
  • Dimensions and distortion

04Standards and references

ISO 14175 (shielding gases), ISO 14341 and ISO 17632 (consumables), ISO 6520 (imperfection classification).

Standards are named for orientation. The applicable edition and acceptance criteria are those in your contract and specification.

05How we support buyers of arc welding parts

Direct contact. No forms.

Discuss your inspection, audit or project requirements

Send us the purchase order scope, drawings, specifications or ITP and the supplier location. You will receive a written proposal with scope, inspector profile, schedule and reporting format.

Email[email protected] Telephone+90 533 197 19 81
OfficeBeştepe Mah. Nergiz Sok. 7/2 Kat:3 No: 87, Yenimahalle, Ankara, Turkey