Powder and additive

Powder metallurgy and sintering: what goes wrong and where to inspect

Metal powder is compacted in a die and sintered in a furnace to make gears, bushings, sprockets and structural parts with little or no machining.

01How the process works

Mixed powder is pressed to a green compact, sintered below the melting point so particles bond, and optionally sized, oil impregnated, heat treated or machined. Metal injection moulding (MIM) adds a binder for complex small parts.

Density and its distribution determine strength. Cracks in green compacts, density variation and dimensional change in sintering are the main risks, verified by density measurement, sectioning and hardness.

  1. Powder mixing. Powder and lubricant blended.
  2. Compaction. Pressed in die to green part.
  3. Sintering. Furnace with protective atmosphere.
  4. Sizing and finishing. Calibration, impregnation, heat treatment.
  5. Inspection. Density, dimensions, hardness.

02What typically goes wrong

DefectTypical causeHow it is found
Low or uneven densityFill, press settingsArchimedes density, sectioning
Green cracksEjection, designVisual, sectioning
Dimensional changeSinter conditionsGauges, CMM
DecarburisationAtmosphereHardness, metallography
BlistersLubricant burn-offVisual
Low hardnessHeat treatmentApparent hardness test

03Where an inspector should look

01

Before production

  • Material grade and density spec
  • Tool approval
02

During production

  • Green weight and density
  • Sinter atmosphere
03

After production

  • Density, hardness
  • Dimensions
  • Crack check on samples

04Standards and references

ISO 5755 (sintered materials), ISO 2738 (density), ISO 4498 (apparent hardness), MPIF Standard 35.

Standards are named for orientation. The applicable edition and acceptance criteria are those in your contract and specification.

05How we support buyers of powder metallurgy parts

Direct contact. No forms.

Discuss your inspection, audit or project requirements

Send us the purchase order scope, drawings, specifications or ITP and the supplier location. You will receive a written proposal with scope, inspector profile, schedule and reporting format.

Email[email protected] Telephone+90 533 197 19 81
OfficeBeştepe Mah. Nergiz Sok. 7/2 Kat:3 No: 87, Yenimahalle, Ankara, Turkey