Plastics, rubber and composites

Plastic injection moulding: what goes wrong and where to inspect

The dominant process for plastic parts, from small clips to large housings. Quality depends on the mould, the dried material and a stable process window.

01How the process works

Plastic granules are dried, melted by a rotating screw and injected into a closed steel mould. The melt is held under pressure while it cools, then the mould opens and ejectors push the part out. Cycles take seconds to minutes; multi-cavity moulds produce several parts per shot.

Most defects are explained by four factors: mould design and condition, material and drying, machine set-up, and the process window (temperatures, pressures, times). Dimensional stability also depends on conditioning, because many plastics such as polyamide change size as they absorb moisture.

  1. Material drying. Granules dried to the supplier's moisture limit.
  2. Plasticising. Screw melts and doses the material.
  3. Injection and hold. Melt fills the cavity; holding pressure packs it.
  4. Cooling and ejection. Part solidifies and is ejected.
  5. Post processing. Degating, inspection, packing.

02What typically goes wrong

DefectTypical causeHow it is found
Short shotLow injection pressure, cold mould, blocked ventsVisual, weight check
Sink marks and voidsThick sections, low hold pressureVisual, sectioning
WarpageUneven cooling, fibre orientationFixture, CMM
FlashWorn parting line, excess pressureVisual
Weld linesFlow fronts meeting, low temperatureVisual, strength test
Splay and silver streaksWet materialVisual, moisture analysis
Burn marksTrapped air, overheatingVisual
Brittle partsDegraded material, excess regrindImpact or snap test

03Where an inspector should look

01

Before production

  • Mould approval and cavity identification
  • Material grade, colour and regrind policy
  • Dryer settings and moisture limit
  • Process window documented
02

During production

  • First off approval per cavity
  • Process parameter monitoring
  • Part weight trend
  • Cavity balance
03

After production

  • Dimensions after conditioning
  • Visual against limit samples
  • Functional and assembly checks
  • Packaging to avoid deformation

04Standards and references

ISO 20457 (tolerances for moulded plastic parts), ISO 294 (test specimens), material datasheets for drying and processing.

Standards are named for orientation. The applicable edition and acceptance criteria are those in your contract and specification.

05How we support buyers of injection moulding parts

Frequently asked questions

How many parts should be measured at first article?

At least one part from every cavity of the mould, measured completely against the drawing after the conditioning time required by the material. Cavity numbers must be traceable on the parts.

Why do dimensions change after moulding?

Plastics continue to shrink while they cool and, for hygroscopic materials such as PA6 and PA66, change size when they absorb moisture. Measuring too early or without conditioning gives misleading results.

Direct contact. No forms.

Discuss your inspection, audit or project requirements

Send us the purchase order scope, drawings, specifications or ITP and the supplier location. You will receive a written proposal with scope, inspector profile, schedule and reporting format.

Email[email protected] Telephone+90 533 197 19 81
OfficeBeştepe Mah. Nergiz Sok. 7/2 Kat:3 No: 87, Yenimahalle, Ankara, Turkey