Forging and forming

Pipe and tube manufacturing: what goes wrong and where to inspect

Line pipe, structural tube and pressure tube are produced by forming and welding strip or plate (ERW, LSAW, SSAW) or by piercing and rolling solid billets (seamless).

01How the process works

Welded pipe is formed from strip or plate and welded longitudinally or spirally by high frequency induction (ERW) or submerged arc welding (SAW). Seamless pipe is pierced from a heated billet and rolled. Both are sized, straightened, cut, end finished and tested.

The weld seam is the critical feature of welded pipe; dimensional tolerances, hydrostatic test and full length NDT are the main controls. Witnessing hydrotests and reviewing NDT records is a typical third party scope.

  1. Strip, plate or billet. Material verified and identified.
  2. Forming. Roll forming, pressing or piercing.
  3. Welding or rolling. ERW or SAW seam; seamless rolling.
  4. Sizing and finishing. Sizing, straightening, cutting, bevelling.
  5. Testing. Hydrotest, NDT, dimensions, marking.

02What typically goes wrong

DefectTypical causeHow it is found
Lack of fusion in seamWelding parametersUT of weld seam
Hook cracksInclusions at strip edgeUT, flattening test
Ovality and thickness deviationSizing, piercingDimensional gauges, UT
LaminationsPlate qualityUT of body
Hydrotest leaksSeam defectsHydrostatic test
Coating holidaysCoating applicationHoliday detector

03Where an inspector should look

01

Before production

  • Material grade and certificates
  • Welding and NDT procedures
  • Test plan per heat and lot
02

During production

  • Seam weld parameters
  • In line UT or ET
  • Mechanical test sampling
03

After production

  • Hydrostatic test witness
  • Dimensions, ends, marking
  • Coating and packing for shipment

04Standards and references

API 5L and ISO 3183 (line pipe), EN 10217 and EN 10216 (welded and seamless pressure tubes), EN 10219 (structural hollow sections), ASTM A106 and A53.

Standards are named for orientation. The applicable edition and acceptance criteria are those in your contract and specification.

05How we support buyers of pipe and tube parts

Direct contact. No forms.

Discuss your inspection, audit or project requirements

Send us the purchase order scope, drawings, specifications or ITP and the supplier location. You will receive a written proposal with scope, inspector profile, schedule and reporting format.

Email[email protected] Telephone+90 533 197 19 81
OfficeBeştepe Mah. Nergiz Sok. 7/2 Kat:3 No: 87, Yenimahalle, Ankara, Turkey