Plastics, rubber and composites

Rubber moulding and vulcanising: what goes wrong and where to inspect

Seals, gaskets, anti-vibration mounts and rubber to metal bonded parts are moulded and vulcanised from compounded elastomers.

01How the process works

A compound of polymer, fillers and curatives is mixed, preformed and moulded by compression, transfer or injection in heated moulds, where it vulcanises. Bonded parts use metal inserts coated with adhesive systems. Parts are deflashed and sometimes post cured.

Compound consistency (hardness, cure curve) and cure state decide the properties. Flash, non-fills, bubbles and poor bonding are typical defects; hardness and compression set confirm the material.

  1. Compound mixing. Batches mixed and tested by rheometer.
  2. Preform. Blanks cut or extruded.
  3. Moulding. Cured in heated mould.
  4. Deflashing. Flash removed mechanically or cryogenically.
  5. Testing. Hardness, dimensions, bond tests.

02What typically goes wrong

DefectTypical causeHow it is found
Non-fillInsufficient compound, flowVisual
Bubbles and porosityTrapped air, moistureVisual, section
FlashMould wear, excess materialVisual
UndercureTime or temperatureHardness, rheometer
Bond failureInsert preparation, adhesivePeel or pull test
Hardness out of rangeCompound variationShore durometer

03Where an inspector should look

01

Before production

  • Compound specification and batch tests
  • Mould approval
02

During production

  • Cure time and temperature
  • Batch traceability
03

After production

  • Hardness and dimensions
  • Bond tests for bonded parts
  • Visual against limit samples

04Standards and references

ISO 3302 (rubber tolerances), ISO 48 (hardness), ISO 815 (compression set), ISO 813 (adhesion to rigid substrates).

Standards are named for orientation. The applicable edition and acceptance criteria are those in your contract and specification.

05How we support buyers of rubber moulding parts

Direct contact. No forms.

Discuss your inspection, audit or project requirements

Send us the purchase order scope, drawings, specifications or ITP and the supplier location. You will receive a written proposal with scope, inspector profile, schedule and reporting format.

Email[email protected] Telephone+90 533 197 19 81
OfficeBeştepe Mah. Nergiz Sok. 7/2 Kat:3 No: 87, Yenimahalle, Ankara, Turkey