Welding and joining

Submerged arc welding: what goes wrong and where to inspect

Submerged arc welding deposits large volumes of weld metal under a blanket of granular flux: longitudinal and circumferential seams of vessels, pipes, wind towers and heavy beams.

01How the process works

The arc burns under flux, which shields the weld and forms a slag. The process is mechanised on tractors, column and boom manipulators or rotators, with single or multiple wires. Heat input is high, so toughness of weld and heat affected zone must be qualified.

Flux moisture, wire and flux combination, heat input and interpass temperature are the critical controls. Slag inclusions between passes and centreline cracking in deep narrow joints are classic problems.

  1. Joint preparation. Bevel and fit-up on thick plate.
  2. Flux handling. Flux baked and kept dry.
  3. Welding. Mechanised passes with controlled heat input.
  4. Back gouging. Root removed and rewelded where required.
  5. Inspection. VT, UT or RT, mechanical tests on coupons.

02What typically goes wrong

DefectTypical causeHow it is found
Slag inclusionsInterpass cleaningRT, UT
Centreline crackingBead shape, joint geometryUT, MT
PorosityDamp flux, contaminationRT
Low toughnessExcess heat inputImpact tests on production coupons
Lack of fusionWire positionUT
UndercutSpeed, voltageVT

03Where an inspector should look

01

Before production

  • WPS with heat input range
  • Wire and flux certificates
  • Production test coupon plan
02

During production

  • Flux baking and recycling
  • Heat input and interpass temperature
  • Wire alignment
03

After production

  • UT or RT per code
  • Production coupon tests
  • Dimensions and ovality

04Standards and references

ISO 14171 and ISO 14174 (SAW wires and fluxes), ASME Section VIII and EN 13445 for vessels.

Standards are named for orientation. The applicable edition and acceptance criteria are those in your contract and specification.

05How we support buyers of saw parts

Direct contact. No forms.

Discuss your inspection, audit or project requirements

Send us the purchase order scope, drawings, specifications or ITP and the supplier location. You will receive a written proposal with scope, inspector profile, schedule and reporting format.

Email[email protected] Telephone+90 533 197 19 81
OfficeBeştepe Mah. Nergiz Sok. 7/2 Kat:3 No: 87, Yenimahalle, Ankara, Turkey