Metal additive manufacturing: what goes wrong and where to inspect

Laser powder bed fusion builds complex metal parts layer by layer: tooling inserts, aerospace brackets, medical implants and spare parts.

01How the process works

A laser melts thin layers of metal powder according to the CAD slice, repeating thousands of times. Parts are stress relieved, removed from the build plate, often HIP treated and machined. Directed energy deposition adds material with a powder or wire fed head.

Quality depends on powder condition, machine qualification, parameter set and build orientation. Porosity, lack of fusion and residual stress are the main risks; witness coupons in each build and CT scanning verify the result.

  1. Powder control. Powder lot, reuse and sieving.
  2. Build preparation. Orientation, supports, parameters.
  3. Building. Layer by layer laser melting.
  4. Post processing. Stress relief, removal, HIP, machining.
  5. Testing. Coupons, CT, dimensions.

02What typically goes wrong

DefectTypical causeHow it is found
Lack of fusion porosityParameters, powderCT scan, metallography
Gas porosityPowder moistureCT
Distortion and cracksResidual stress, supportsCMM, visual
Surface roughnessOrientation, down skinsRoughness tester
Low propertiesHeat treatment, contaminationCoupon tests
Powder contaminationReuse controlChemical analysis

03Where an inspector should look

01

Before production

  • Machine and parameter qualification
  • Powder specification and reuse limits
02

During production

  • Build logs and monitoring
  • Witness coupons
03

After production

  • CT or density check
  • Coupon tests
  • Dimensions after machining

04Standards and references

ISO/ASTM 52900 series, ISO/ASTM 52920 (qualification), ASTM F3301 (post processing).

Standards are named for orientation. The applicable edition and acceptance criteria are those in your contract and specification.

05How we support buyers of metal 3d printing parts

Direct contact. No forms.

Discuss your inspection, audit or project requirements

Send us the purchase order scope, drawings, specifications or ITP and the supplier location. You will receive a written proposal with scope, inspector profile, schedule and reporting format.

Email[email protected] Telephone+90 533 197 19 81
OfficeBeştepe Mah. Nergiz Sok. 7/2 Kat:3 No: 87, Yenimahalle, Ankara, Turkey