Electrical and assembly
Mechanical assembly and end of line testing: what goes wrong and where to inspect
Pumps, gearboxes, valves, machines and skids are assembled from many sourced parts and tested at the end of the line. This is where hidden supply chain problems finally show up.
01How the process works
Assembly brings together machined parts, bearings, seals, fasteners, electrical components and purchased equipment. Work instructions define sequence, torques, fits, lubrication and adjustments. End of line testing proves function: running, pressure, leak, noise, vibration and performance.
Contamination, wrong parts, missing torque and misalignment are typical assembly defects. Test results are only meaningful if instruments are calibrated and test procedures agreed in advance.
- Kitting. Parts verified and cleaned.
- Sub-assembly. Bearings, seals and modules assembled.
- Final assembly. Sequence, torques, alignment.
- Testing. Run, pressure, leak, performance tests.
- Final inspection. Paint, nameplate, documents, packing.
02What typically goes wrong
| Defect | Typical cause | How it is found |
|---|---|---|
| Contamination | Cleanliness of parts and area | Visual, cleanliness tests |
| Wrong or missing parts | Kitting errors | Visual against BOM |
| Missing torque | Tool or operator | Torque audit, marks |
| Misalignment and vibration | Assembly fits, alignment | Vibration measurement |
| Leaks | Seals, assembly damage | Leak test |
| Performance below spec | Component or assembly issue | Performance test |
03Where an inspector should look
Before production
- Work instructions and test procedures
- Critical parts verified
During production
- Torque and alignment checks
- Cleanliness
After production
- Run and performance tests witnessed
- Nameplate, documents
- Preservation and packing
04Standards and references
ISO 9906 (pump acceptance tests), ISO 10816 and ISO 20816 (vibration), API 610 for process pumps, Machinery Directive essential requirements.
Standards are named for orientation. The applicable edition and acceptance criteria are those in your contract and specification.